{"id":4726,"date":"2026-11-27T06:00:00","date_gmt":"2026-11-27T06:00:00","guid":{"rendered":"https:\/\/projectfifty4.com\/?p=4726"},"modified":"2026-11-26T21:51:15","modified_gmt":"2026-11-26T21:51:15","slug":"what-is-a-performance-bond-energy","status":"publish","type":"post","link":"https:\/\/projectfifty4.com\/ar\/what-is-a-performance-bond-energy\/","title":{"rendered":"What Is a Performance Bond in Energy?"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>A performance bond is not insurance and it is not a deposit. It is a bank&#8217;s promise to pay your customer if you do not deliver, and it consumes a credit line you could have used for something else. The World Bank&#8217;s own standard plant contract shows how the instrument is built \u2014 and shows that the number everyone argues about is left blank for the buyer to fill in. Siemens Energy&#8217;s accounts show what the same instrument costs at scale.<\/p>","protected":false},"author":12,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"p54_bench":"","p54_evergreen":"","p54_content_id":"P54-C-4726","p54_run_id":"P54-ENG-20261115-1205","p54_article_data":"{\"meta\": {\"kicker\": \"Insight \u00b7 Commercial Mechanics\", \"topics\": [\"Procurement\", \"Contracts\"], \"title\": \"The Bond Behind the Order: What a Buyer Is Really Asking For\", \"dek\": \"A performance bond is not insurance and it is not a deposit. It is a bank's promise to pay your customer if you do not deliver, and it consumes a credit line you could have used for something else. The World Bank's own standard plant contract shows how the instrument is built \u2014 and shows that the number everyone argues about is left blank for the buyer to fill in. Siemens Energy's accounts show what the same instrument costs at scale.\", \"date\": \"2026-11-27\", \"readTime\": \"8 min read\", \"author\": \"Michael Hudson\", \"slug\": \"what-is-a-performance-bond-energy\"}, \"quickAnswer\": {\"q\": \"What is a performance bond, and why does a buyer want one?\", \"a\": \"A performance bond, or performance security, is an undertaking from a bank or surety that pays your customer an agreed sum if you fail to perform the contract. It is issued on your behalf, against your credit, and the buyer can call it without first proving a loss in court. In the World Bank's standard plant contract the contractor must provide it \\\"within twenty-eight (28) days of the notification of contract award, provide a security for the due performance of the Contract in the amount specified in the PCC\\\" \u2014 and the amount itself is left as a blank for the buyer to complete, which is why the percentage is a negotiation and not a market standard. The practical consequence for a supplier is that winning the order consumes balance-sheet capacity as well as factory capacity. Siemens Energy secured guarantee lines of \u20ac12 billion in December 2023, a facility reinsured by the German government, which is the scale at which this stops being paperwork and becomes a financing problem.\"}, \"takeaways\": [\"A performance bond is a payment promise from your bank to your customer, not cover for you. In the World Bank's standard plant contract it must be provided within twenty-eight (28) days of the notification of contract award.\", \"The percentage is not a standard. In the World Bank document the clause reads \\\"The amount of Performance Security, as a percentage of the Contract Price\\\" followed by a blank line. The buyer writes the number. If you treat it as fixed you have given away the negotiation before it starts.\", \"You do not get it back at delivery. Unless the contract says otherwise \\\"the security shall be reduced by half on the date of the Operational Acceptance\\\", and it expires 540 days after Completion or 365 days after Operational Acceptance, whichever comes first.\", \"Bonding capacity is a real constraint on growth. Siemens Energy's December 2023 arrangement secured guarantee lines of \u20ac12 billion and was reinsured by the German government; it was replaced in June 2025 by a new guarantee agreement with a banking syndicate.\", \"Do not confuse the bonds you issue with the ones you carry for others. Siemens Energy's Note 18 reports \u20ac188 million of maximum potential future payments across all major guarantee types at 30 September 2025 \u2014 a contingent-liability disclosure, not the size of its customer bonding.\"], \"sections\": [{\"id\": \"what-it-is\", \"q\": \"What is a performance bond?\", \"h\": \"It is your bank's promise, not your insurance policy\", \"p\": [\"A performance bond \u2014 the drafting term is usually performance security \u2014 is an undertaking given by a bank or a surety company that it will pay your customer an agreed sum of money if you fail to perform the contract. It is issued on your instruction, against your credit, and in most forms the customer can call it on a written demand rather than by first proving a loss. It protects the buyer. It costs you.\", \"The clearest free statement of how the instrument is built sits in the World Bank's standard procurement document for plant \u2014 the Request for Bids used for design, supply and installation contracts, published in October 2017. Its General Conditions require the contractor, \\\"within twenty-eight (28) days of the notification of contract award, provide a security for the due performance of the Contract in the amount specified in the PCC\\\". Twenty-eight days is not long if your bank has to credit-approve a new exposure.\", \"The same conditions require that \\\"The Performance Security shall be denominated in the currency or currencies of the Contract\\\". That line does more work than it looks like it does. If you are paid in one currency and bonded in another, you have taken a currency position on top of a delivery obligation, and it sits on your facility for years.\"]}, {\"id\": \"the-blank\", \"q\": \"How much is a performance bond, as a percentage?\", \"h\": \"The number everyone quotes as standard is a blank line in the document\", \"p\": [\"Ask around and you will be told ten per cent. The World Bank's own document does not say that. In the Particular Conditions the clause reads \\\"The amount of Performance Security, as a percentage of the Contract Price\\\" \u2014 and then stops, with a blank for the employer to fill in before the tender goes out. There is no default. The buyer chooses, and it arrives in your tender pack as though it were arithmetic rather than a position.\", \"The one place the document does commit to a figure is much narrower: where an extended defect liability applies, \\\"The Performance Security shall be reduced to ten percent (10%) of the value of the component covered by the extended defect liability\\\". Ten per cent of one component's value at the tail end of a contract is a different animal from ten per cent of the whole contract price for its entire life, and the two get conflated constantly.\", \"This matters commercially because a bond is priced on your credit, not on the project's. Two suppliers quoting the same equipment at the same price are not making the same margin if one is carrying twice the security for twice as long. If you are not costing the bond into the bid, your competitor's finance director probably is.\"]}, {\"id\": \"when-released\", \"q\": \"When do you get a performance bond back?\", \"h\": \"Not at delivery. Usually not at acceptance either\", \"p\": [\"The instinct is that the security dies when the equipment arrives and works. It does not. Under the World Bank conditions, unless the contract says otherwise, \\\"the security shall be reduced by half on the date of the Operational Acceptance\\\" \u2014 halved, not released.\", \"Full expiry comes later. The security becomes null and void \\\"hundred and forty (540) days after Completion of the Facilities or three hundred and sixty five (365) days after Operational Acceptance of the Facilities, whichever occurs first\\\". So on a contract that completes cleanly you are still carrying half the exposure for roughly a year after the customer has started using the plant, and longer if the defects liability period is extended.\", \"Put that next to a long manufacturing lead time and the arithmetic gets uncomfortable. An order booked today with a two-year build, a year of commissioning and a year of tail can occupy your guarantee facility for four years. The order looks like growth in the backlog. On the facility it looks like a line that is no longer available for the next order.\"]}, {\"id\": \"protection\", \"q\": \"Can a customer call a performance bond unfairly?\", \"h\": \"There is a limit written into the clause, and it is narrower than it sounds\", \"p\": [\"The World Bank conditions do constrain the employer: \\\"The Employer shall not make a claim under the Performance Security, except for amounts to which the Employer is entitled under the Contract\\\", and the employer must indemnify the contractor against the cost of a claim it was not entitled to make.\", \"Read that carefully. It is a promise about entitlement and a remedy after the fact. It is not a mechanism that stops the bank paying. With an on-demand instrument the money usually moves first and the argument happens afterwards, with you as the claimant rather than the defendant \u2014 a materially worse position than the one you were in the day before.\", \"Which is why the form of the security is worth as much attention as its size. The World Bank's contract forms section offers both a bank guarantee and a conditional bank guarantee, and the Particular Conditions again leave the choice as a blank for the employer. Conditional is harder to call. It is also, predictably, the one you have to ask for.\"]}, {\"id\": \"at-scale\", \"q\": \"What does bonding capacity cost a large supplier?\", \"h\": \"Siemens Energy needed a sovereign to stand behind its guarantee lines\", \"p\": [\"The clearest public illustration of what this instrument costs at scale is in Siemens Energy's own consolidated accounts. In December 2023 the company entered a combined call and put option over 5% of its stake in Siemens Limited, Mumbai, India, \\\"to secure guarantee lines of \u20ac12 billion\\\". Its 2025 notes record what happened next: \\\"This facility, reinsured by the German government, was replaced in June 2025 by a new guarantee agreement signed with a banking syndicate.\\\"\", \"Twelve billion euro of guarantee lines is not borrowing. It is the capacity to issue promises \u2014 advance payment securities, performance bonds, warranty bonds \u2014 so that customers will place orders at all. A manufacturer with a full order book had to pledge an equity stake and take a sovereign reinsurance to get it. That is the clearest available evidence that in this industry bonding capacity, not demand, can be the thing that limits how much work a supplier can accept.\", \"One distinction is worth holding onto, because it is easy to get wrong in both directions. Siemens Energy's Note 18 presents \\\"the undiscounted amount of maximum potential future payments for major types of guarantees\\\" and totals \u20ac188 million at 30 September 2025 against \u20ac208 million a year earlier, of which guarantees of third-party performance are \u20ac83 million against \u20ac100 million. Those are guarantees the company has issued for others \u2014 the note says they \\\"mainly include guarantees of advance payments and performance bonds in consortium arrangements\\\", with terms \\\"typically\u2026 up to ten years\\\". They are not a measure of the bonds standing behind its own customer contracts. A contingent-liability note and a guarantee facility answer different questions, and quoting one for the other will make you sound wrong to a treasurer.\"]}, {\"id\": \"why-now\", \"q\": \"Why are buyers asking for more security now?\", \"h\": \"When the scarce thing is the factory slot, security is how a buyer buys certainty\", \"p\": [\"This is the engine's own commercial reading rather than a claim from either document, so take it as reasoning and not as sourcing. When equipment was easy to buy, a buyer's exposure was mostly price. When the backlog is long and the constraint is the factory slot \u2014 the position the large grid cable makers are now in, with their published transmission backlogs running years ahead of their capacity, as set out in <a href=\\\"https:\/\/projectfifty4.com\/prysmian-nexans-grid-cable-backlog-2026\/\\\">our look at the Prysmian and Nexans order books<\/a> \u2014 the buyer's exposure moves to schedule. A plant that is late is not inconvenient, it is a missed connection date and a missed revenue year.\", \"Security is one of the few levers a buyer has against that. It cannot make your factory faster, but it can make your lateness expensive, and it can make your lateness visible to your bank. Expect the percentage in the tender pack to drift up, expect on-demand forms to be preferred to conditional ones, and expect the release schedule to be written later rather than earlier.\", \"The supplier's answer is not to refuse. It is to price it, to put the release schedule on the table as a negotiable item alongside the percentage, and to know your own facility headroom before you decide which tenders to chase. A bid you win that you cannot bond is worse than a bid you declined.\"]}, {\"id\": \"what-to-do\", \"q\": \"What should a supplier do before bidding?\", \"h\": \"Four things to settle before the tender, not after the award\", \"p\": [\"First, read the Particular Conditions, not the General Conditions. The general text is boilerplate; every number that costs you money \u2014 the percentage, the form of guarantee, the release points, and separately the \\\"Applicable rate for liquidated damages\\\" and the \\\"Maximum deduction for liquidated damages\\\" \u2014 is a blank that somebody filled in. Blanks are negotiable in a way that printed clauses are not.\", \"Second, get your bank's answer before you price, not after you win. Twenty-eight days from award is the contractual clock in the World Bank form, and a credit committee does not care that you have already signed.\", \"Third, cost the full duration, not the delivery date. Half the security surviving to 540 days after completion is a carrying cost that belongs in the bid, and most tender models stop at handover.\", \"Fourth, treat bonding headroom as a qualification criterion you apply to yourself. Buyers already test your financial standing when they build their approved-supplier lists; the honest version of that test, applied internally, tells you which work you can actually take \u2014 the same discipline a buyer applies when it builds <a href=\\\"https:\/\/projectfifty4.com\/energy-supplier-prequalification-register-2026\/\\\">its prequalification register<\/a>. If you want a second pair of eyes on how your security terms compare with what the rest of the market is conceding, <a href=\\\"https:\/\/projectfifty4.com\/book-a-strategy-call\/\\\">book a strategy call<\/a> and bring a recent tender pack.\"]}], \"faq\": [{\"q\": \"Is a performance bond the same as insurance?\", \"a\": \"No, and the difference is the whole point. Insurance pays you when something goes wrong. A performance bond pays your customer when you go wrong, and then your bank or surety looks to you for the money. It is a credit instrument issued against your balance sheet, which is why it reduces what you can borrow or bond elsewhere.\"}, {\"q\": \"Is 10% the standard performance bond percentage in energy contracts?\", \"a\": \"It is a convention, not a standard, and the most widely used public contract form does not set it. The World Bank's Request for Bids for plant leaves the Particular Conditions clause \\\"The amount of Performance Security, as a percentage of the Contract Price\\\" as a blank for the employer to complete. The one place the form does fix 10% is narrower: where an extended defect liability applies, the security is reduced to ten percent of the value of the component covered by that extended liability.\"}, {\"q\": \"When is a performance bond released?\", \"a\": \"Later than most bid models assume. Under the World Bank conditions, unless the contract says otherwise, the security is reduced by half on the date of Operational Acceptance, and it expires 540 days after Completion of the Facilities or 365 days after Operational Acceptance, whichever occurs first. If the defects liability period is extended on part of the works, an additional security is required for that part.\"}, {\"q\": \"Can a customer call a bond when it is not entitled to?\", \"a\": \"The clause says it should not: the employer \\\"shall not make a claim under the Performance Security, except for amounts to which the Employer is entitled under the Contract\\\", and must indemnify the contractor for a claim it was not entitled to make. In practice that is a remedy after the money has moved rather than a block on it moving, which is why the form of the guarantee \u2014 on-demand or conditional \u2014 matters as much as the amount.\"}, {\"q\": \"How does bonding capacity limit how much work a supplier can take?\", \"a\": \"Every bond issued consumes a line your bank has approved, for as long as the bond runs. Because the bond outlives delivery, a long order book ties up guarantee capacity for years. Siemens Energy's accounts show the scale this can reach: in December 2023 it pledged an option over part of its stake in Siemens Limited, Mumbai, to secure guarantee lines of \u20ac12 billion, reinsured by the German government, and replaced that facility in June 2025 with a new guarantee agreement signed with a banking syndicate.\"}], \"related\": [{\"title\": \"Prysmian, Nexans and the Grid Cable Backlog\", \"topic\": \"Grid\", \"href\": \"\/prysmian-nexans-grid-cable-backlog-2026\/\"}, {\"title\": \"Energy Supplier Prequalification: What the Register Decides\", \"topic\": \"Procurement\", \"href\": \"\/energy-supplier-prequalification-register-2026\/\"}, {\"title\": \"Selling Through EPC Contractors\", \"topic\": \"Channels\", \"href\": \"\/selling-through-epc-contractors-energy-suppliers\/\"}, {\"title\": \"Supplier Prequalification in Energy B2B\", \"topic\": \"Procurement\", \"href\": \"\/supplier-prequalification-energy-b2b\/\"}, {\"title\": \"What Is B2B Energy Procurement?\", \"topic\": \"Procurement\", \"href\": \"\/what-is-b2b-energy-procurement\/\"}, {\"title\": \"Specification Selling and the FEED Stage\", \"topic\": \"Projects\", \"href\": \"\/specification-selling-energy-projects-feed\/\"}], \"poll\": {\"q\": \"On your last major tender, who set the performance security percentage?\", \"options\": [\"The buyer, take it or leave it\", \"We negotiated it down\", \"We never looked \u2014 finance handled it after award\", \"We walked away over it\"]}, \"newsletter\": {\"kicker\": \"Project 54\", \"title\": [\"The commercial mechanics\", \"behind the energy order book\"], \"body\": \"One piece a week on how energy buyers actually award work \u2014 the clauses, the scoring and the money \u2014 written for the people who have to win the tender.\", \"placeholder\": \"you@company.com\", \"cta\": \"Subscribe\", \"note\": \"No spam. Unsubscribe any time.\"}, \"translationsIndexable\": [], \"media\": {\"image\": {\"src\": \"https:\/\/projectfifty4.com\/wp-content\/uploads\/2026\/10\/jackup-rig-crane-barge-sunset.jpg\", \"label\": \"A crane barge alongside a jack-up rig at sunset.\", \"credit\": \"Unsplash Licence\"}, \"infographicLabel\": \"Performance security over a contract's life: 100% from award, halved at Operational Acceptance, expiring at 540 days after Completion or 365 days after Operational Acceptance, whichever comes first (World Bank SPD for Plant, 2017).\"}, \"factCheck\": {\"date\": \"2026-11-15\", \"run_id\": \"P54-ENG-20261115-1205\", \"method\": \"Rule 5, primary sources only, two issuer documents, both DOWNLOADED and read as text rather than summarised from a fetch: the World Bank's Standard Procurement Document, Request for Bids, Plant (Design, Supply and Installation), October 2017 (PDF, 1,989,715 bytes, 435,626 characters after text extraction and whitespace normalisation) and Siemens Energy's Notes to the Consolidated Financial Statements, Annual Report 2025 (PDF, 1,031,095 bytes, 177,710 characters). EVERY load-bearing string was then asserted as an EXACT substring of that text before a word of prose was written: 22 candidates, 20 asserted, 2 failures both of which were controls that had to fail. Evidence: run20261115\/assertions.json.\", \"negativeControls\": [\"A fabricated clause - 'the Performance Security shall be fixed at twelve percent (12%) of the Contract Price' - was put through the same harness and was SEEN to fail. Without that, a run of passes proves nothing (7 Nov lesson: a negative test must be seen to fail before its passing means anything).\", \"A second, unplanned control: 'Guarantees of third-party performance' was accidentally submitted against the World Bank document as well as the Siemens Energy one. It FAILED against the World Bank text and PASSED against Siemens Energy, which proves the harness is checking the document it says it is checking, not merely searching everything it has loaded.\"], \"quotationDiscipline\": \"Every passage in quotation marks is verbatim from the named document and was asserted as an exact substring. One quotation - the 540\/365-day expiry - is reproduced starting mid-phrase as 'hundred and forty (540) days after Completion...' because the sentence is split across a page break in the source PDF by the running header 'Section VIII - General Conditions of Contract 137'. The full sentence begins 'five hundred and forty'; the assertion was taken on the post-header fragment so that it is a true exact substring of the extracted text rather than a silently repaired one.\", \"judgementCalls\": [\"The 'Why are buyers asking for more security now?' section is labelled IN THE BODY as the engine's own commercial reading rather than a claim from either source, because neither document says anything about market conditions in 2026. It is reasoning from the cited mechanics and is marked as such.\", \"The roughly EUR 24 billion Prysmian\/Nexans transmission backlog figure was DROPPED from this piece rather than restated. It is sourced in P54-C-4689, but this run did not re-verify it against Prysmian's and Nexans' own releases, and Rule 5 says drop or disclose rather than launder a figure through an internal link. The section now describes the position qualitatively and links to 4689 where the sourced numbers live.\", \"Siemens Energy's Note 18 total (EUR 188 million at 30 September 2025) is explicitly distinguished in the body from the EUR 12 billion guarantee lines. The note measures maximum potential future payments on guarantees the company has ISSUED FOR OTHERS, mainly in consortium arrangements; the facility measures capacity to issue. Conflating them would overstate or understate the point by two orders of magnitude, and the piece says so.\", \"FIDIC's own contract forms would be the more familiar reference for this topic and were NOT used: the text is copyrighted and not freely published, so it could neither be downloaded nor asserted, and citing a law firm's summary of a clause would be a secondary source for the clause itself. The World Bank SPD is a published document from the issuing institution and does the same job.\", \"No liquidated-damages claim is made beyond naming the two PCC blanks ('Applicable rate for liquidated damages', 'Maximum deduction for liquidated damages'), both asserted. LDs are a separate instrument and a separate article; the Rule 6 sweep this run found zero existing pages on them, so they are clean white space for a later slot.\"], \"cannibalisation\": \"Rule 6, run BEFORE the topic was committed to, and it changed the topic twice. (1) Slug and title sweep over 256 posts of EVERY status (publish 221, future 11, draft 24, pending 0, private 0), each status asserted against x-wp-total. 'performance bond', 'guarantee', 'bank guarantee', 'surety', 'collateral', 'working capital', 'credit line' and 'bonding' all returned ZERO hits. (2) The first two candidate topics were REJECTED by the same sweep: grid connection queues collides with P54-C-4551 eu-grids-package-connection-queues-suppliers-2026 and P54-C-4436 ferc-large-load-interconnection-rules-2026, both live; EPC and FEED collide with P54-C-4424 and P54-C-4339, both live. (3) GSC head term over 90 days (2026-08-17 to 2026-11-14), query filter 'contains damages': no rows at all, so no existing page earns impressions for the adjacent head term either. LIMITATION RECORDED: GSC query data is thresholded and the site's query dimension has only ever resolved about 10 per cent of total impressions, so a nil return is weaker evidence than it looks. (4) Rule 6.4 same-week check: the week of 23-29 Nov holds P54-C-4721 (book-to-bill, order intake) on Mon 23 and P54-C-4723 (take-or-pay, gas volume commitment) on Wed 25. Neither is the contract-security cluster. An offtake-agreement piece WAS considered and rejected for exactly this reason: it is the same cluster as take-or-pay in the same week.\", \"sources\": [{\"id\": \"wb-spd-plant-2017\", \"publisher\": \"The World Bank\", \"title\": \"Standard Procurement Document - Request for Bids: Plant (Design, Supply and Installation), after prequalification, October 2017\", \"url\": \"https:\/\/thedocs.worldbank.org\/en\/doc\/575511509642583152-0290022018\/render\/SPDRequestforBidsPLANTafterprequalificationOCT2017.pdf\", \"supports\": \"GCC 13.3.1 the 28-day deadline and the amount being 'specified in the PCC'; GCC 13.3.2 currency and form; GCC 13.3.3 halving at Operational Acceptance and the 540\/365-day expiry; GCC 13.3.4 the limit on the employer's right to claim; PCC 13.3.1 the percentage left blank; PCC 13.3.2 the form left blank; PCC 13.3.3 the 10% extended-defect-liability figure; the two liquidated-damages blanks; and the existence of both a Bank Guarantee and a Conditional Bank Guarantee form in Section X.\", \"verifiedBy\": \"P54-ENG-20261115-1205, PDF downloaded and text-extracted, 13 strings asserted\"}, {\"id\": \"siemens-energy-ar2025-notes\", \"publisher\": \"Siemens Energy AG\", \"title\": \"Notes to the Consolidated Financial Statements, Annual Report 2025 (year ended 30 September 2025)\", \"url\": \"https:\/\/assets.siemens-energy.com\/dam\/9ef45989-fd0b-4ddc-8161-b3b0008091ad\/D-Notes_to_Consolidated_Financial_Statement-pdf_Original%20file.pdf\", \"supports\": \"Note 18 Commitments and contingencies: the guarantee table (third-party performance EUR 83m vs 100m, other EUR 104m vs 63m, total EUR 188m vs 208m) and its description of what those guarantees are and their up-to-ten-year terms; and the fair-value note recording the December 2023 option over 5% of the Siemens Limited, Mumbai stake taken 'to secure guarantee lines of EUR 12 billion', reinsured by the German government and replaced in June 2025 by a new guarantee agreement with a banking syndicate.\", \"verifiedBy\": \"P54-ENG-20261115-1205, PDF downloaded and text-extracted, 7 strings asserted\"}]}}","p54_faq":"[{\"q\": \"Is a performance bond the same as insurance?\", \"a\": \"No, and the difference is the whole point. Insurance pays you when something goes wrong. A performance bond pays your customer when you go wrong, and then your bank or surety looks to you for the money. It is a credit instrument issued against your balance sheet, which is why it reduces what you can borrow or bond elsewhere.\"}, {\"q\": \"Is 10% the standard performance bond percentage in energy contracts?\", \"a\": \"It is a convention, not a standard, and the most widely used public contract form does not set it. The World Bank's Request for Bids for plant leaves the Particular Conditions clause \\\"The amount of Performance Security, as a percentage of the Contract Price\\\" as a blank for the employer to complete. The one place the form does fix 10% is narrower: where an extended defect liability applies, the security is reduced to ten percent of the value of the component covered by that extended liability.\"}, {\"q\": \"When is a performance bond released?\", \"a\": \"Later than most bid models assume. Under the World Bank conditions, unless the contract says otherwise, the security is reduced by half on the date of Operational Acceptance, and it expires 540 days after Completion of the Facilities or 365 days after Operational Acceptance, whichever occurs first. If the defects liability period is extended on part of the works, an additional security is required for that part.\"}, {\"q\": \"Can a customer call a bond when it is not entitled to?\", \"a\": \"The clause says it should not: the employer \\\"shall not make a claim under the Performance Security, except for amounts to which the Employer is entitled under the Contract\\\", and must indemnify the contractor for a claim it was not entitled to make. In practice that is a remedy after the money has moved rather than a block on it moving, which is why the form of the guarantee \u2014 on-demand or conditional \u2014 matters as much as the amount.\"}, {\"q\": \"How does bonding capacity limit how much work a supplier can take?\", \"a\": \"Every bond issued consumes a line your bank has approved, for as long as the bond runs. Because the bond outlives delivery, a long order book ties up guarantee capacity for years. Siemens Energy's accounts show the scale this can reach: in December 2023 it pledged an option over part of its stake in Siemens Limited, Mumbai, to secure guarantee lines of \u20ac12 billion, reinsured by the German government, and replaced that facility in June 2025 with a new guarantee agreement signed with a banking syndicate.\"}]","p54_media":"","p54_comments_enabled":"1","footnotes":""},"categories":[92],"tags":[],"class_list":["post-4726","post","type-post","status-publish","format-standard","hentry","category-analysis"],"acf":[],"_links":{"self":[{"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/posts\/4726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/comments?post=4726"}],"version-history":[{"count":1,"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/posts\/4726\/revisions"}],"predecessor-version":[{"id":4784,"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/posts\/4726\/revisions\/4784"}],"wp:attachment":[{"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/media?parent=4726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/categories?post=4726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectfifty4.com\/ar\/wp-json\/wp\/v2\/tags?post=4726"}],"curies":[{"name":"\u0648\u0648\u0631\u062f\u0628\u0631\u064a\u0633","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}